Prime Minister Narendra Modi has announced a major development cooperation package for Nepal, equivalent to about Rs 15,000 crore, during talks with visiting Nepali Prime Minister Balendra Shah in New Delhi. The two leaders also jointly flagged off a new weekly train service linking Ayodhya Cantt in Uttar Pradesh with Janakpur Dham in Nepal. Together, the announcements mark a significant step in India-Nepal ties and give the visit a strong focus on reconstruction, energy and connectivity.
The Development Package
After delegation-level talks at Hyderabad House, Prime Minister Modi announced a Development Cooperation Package of 24,000 crore Nepali rupees, which works out to roughly Rs 15,000 crore in Indian currency. He said the aim is to support Nepal’s reconstruction and long-term development.
Modi expressed condolences for lives lost in the severe floods that hit Nepal in August. He said the resolve behind the package is that affected families get their lives back on track, that new opportunities are created, and that Nepal’s capacity to deal with future disasters is strengthened.
Before the visit, reports had suggested that India was weighing a package of up to $2 billion covering highways, hydropower, railways and post-flood reconstruction. Detailed project-wise allocations under the final package were not immediately available.
Lower Arun Hydroelectric Project
In the energy sector, the two prime ministers laid the foundation stone for the 669 MW Lower Arun Hydroelectric Project in Nepal. Hydropower is one of the most important areas of cooperation between the two countries. Nepal has large unused potential, and India is a major market for the electricity it can produce.
Ayodhya-Janakpur Train: The Saryu-Kamala Express
The leaders virtually flagged off the Saryu-Kamala Express from New Delhi. It is a weekly service connecting Ayodhya Cantt with Janakpur Dham, two cities with deep religious meaning. Ayodhya is revered as the birthplace of Lord Ram, and Janakpur Dham as the birthplace of Mata Sita.
Key details of the service
- Distance and time: About 604 km, covered in roughly 19 hours.
- Start of regular service: November 28, with one run each way every week.
- From Ayodhya Cantt: Train No. 15596 departs every Monday at 5:50 pm and reaches Janakpur Dham at 12:40 pm on Tuesday, Nepal time.
- From Janakpur Dham: Train No. 15595 leaves every Saturday at 1:10 pm, Nepal time, and reaches Ayodhya Cantt at 8:10 am on Sunday.
- Stops: Jaynagar, Madhubani, Shisho, Sitamarhi, Raxaul, Narkatiaganj, Gorakhpur, Basti, Mankapur and Ayodhya Dham, besides the terminal stations.
The service is expected to make religious journeys between the two cities easier and support tourism along the Ramayana circuit. It also offers a rail option for people travelling for education, business and family reasons across the border.
Why the Visit Matters
This is Balendra Shah’s first bilateral visit to India since he became Nepal’s Prime Minister in March 2026. Observers see it as a practical reset of relations, with a focus on tangible results such as flood recovery, energy projects and transport links. Talks also covered road and air connectivity, trade and investment, according to reports ahead of the meeting.
For India, the package and the rail link reinforce its “Neighbourhood First” approach and keep it a leading development partner for Nepal. For Nepal, the aid comes at a time when it is rebuilding homes and hydropower projects damaged by the August floods.
Religious and Cultural Links
The new train builds on a long-standing cultural connection between Ayodhya and Janakpur. The two cities are tied by the Ramayana, and previous efforts to link them have included a direct bus service and twin-city arrangements. A direct rail service adds a more affordable and scalable option for pilgrims and tourists.
What to Watch Next
-
The detailed breakdown of projects under the development package, and how funds will be disbursed
- Progress on the Lower Arun hydropower project
- The first regular runs of the Saryu-Kamala Express from November 28, and passenger demand
- Further agreements on rail, road, air connectivity and trade
Frequently Asked Questions
How much is the development package for Nepal? The announced package is 24,000 crore Nepali rupees, equivalent to about Rs 15,000 crore.
What is the Saryu-Kamala Express? A weekly train connecting Ayodhya Cantt in Uttar Pradesh with Janakpur Dham in Nepal over about 604 km.
When does regular service begin? On November 28, with one weekly trip in each direction.
What project did the leaders start in Nepal’s energy sector? They laid the foundation stone for the 669 MW Lower Arun Hydroelectric Project.
Why is the package being given? To support Nepal’s post-flood reconstruction and long-term development after the August floods.
© Copyright 2026. All Rights Reserved. Powered by Vygr Media.












